Product Specs
Controller Specifications
- Voltage Unbalance on Dropout for Source 1 and Source 2
- 5 to 20% of nominal
- Delay NeutralTransition Time Delays (DT,DW)
- 0-10 minutes
- Control Power
- 120 VAC
- Undervoltage Dropout for Source 1 and Source 2
- 75-99% of nominal
- Undervoltage Restore for Source 1 and Source 2
- 85-100% of nominal
- Overfrequency Dropout for Source 1 and Source 2
- 50.1 - 63 Hz
- Source Sensing
- 120 - 690 VAC +/- 1% of nominal voltage (+/- .05 Hz, +/-.5 A)
- Delay for Engine Cool Down (U)
- 0-60 minutes
- Underfrequency Restore for Source 1 and Source 2
- 45 - 59.5 Hz
- Load Control Relay Contacts (2)
- 0-259 minutes
- Overvoltage Dropout for Source 1 and Source 2
- 105 - 110% of nominal
- Voltage Unbalance for Restore for Source 1 and Source 2
- 4 to 19% of nominal
- Storage Temperature
- (-40˚C - 90˚C )
- Underfrequency Dropout for Source 1 and Source 2
- 45 - 59.9 Hz
- Overfrequency Restore for Source 1 and Source 2
- 50 - 62.9 Hz
- Delay Transfer to Nonpreferred Source (W)
- 0-5 minutes
- Operating Temperature Ambient
- (-20˚C to 50˚C)
- Communications Interface - Optional
- Serial RS-485 upt to 115.2 Kbps or TCP/IP (10/100 base-T)
- Overvoltage Restore for Source 1 and Source 2
- 103 - 108% of nominal
- Load Control Relay Contacts (1)
- rated for 10A @ 24VDC or 120VAC
Technical Summary
- Rating Range
- Switch Dependent
- Transfer Type
- Application Dependent
- Switch Type
- Application Dependent
Standard Equipment
-
- Status Leds For:
-
- Transfer Inhibit
- Active Alarms
- Source 1 and 2 Availablity
- Source 1 and 2 Connected
- Time Delay Active
-
- Graphical Display:
-
- Color graphical display with USB Calibration/programming port and Embedded Help
- Displays 256 time-tagged events with 1 ms resolution
- Monitors over/under frequency, voltage conditions, frequency imbalance, and phase rotation
- Provided detailed outage,test,and diagnostic reports
-
- Ranges Of Controls / Metering:
-
- Programmable generator exerciser
- Synchroscope
- Contacts for Source 1 and Source 2 position indication as well as remote load test signals, and engine start delay
- Source 1 and Source 2 In-phase monitor
- Neutral, Engine Start, and Engine stop time delay timers
-
- Testing And Certification
-
- Conforms to EN 60947-1, EN 60947-6-1, EN 60255-26 (EN 50263), EN 5502 / CISPR22 / EN 61000-6-2 / EN 61000-6-4
- Tested in accordance with:
IEC 60068-2-30
IEC 60068-2-1
IEC 60068-2-2
IEC 60255-22-1
IEC 60255-22-2
IEC 60255-22-3
IEC 60255-22-4
IEC 60255-22-5
IEC 60255-22-6
IEC 60255-25
IEC 60529; IP54 (front),IP20(back)
IEC 61000-4-11 - Quality System:
Manufactured under an ISO 9001 Registered Program
Attachments
-
- Option Package A:
-
- Four (4) programmable inputs and four (4) outputs assignable to additional ATS features
- Expanded diagnostics, high-speed 256 event capture, 365 days
- Monitoring Software (local or remote), USB interface for uploading and downloading setup parameters
- Full function ATS control with full sensing and control capabilities
- Full complement of programmable ATS control switches AUTO / MAN, Preferred Source selector,Commit / No Commit Xfer, Transition Mode Select for Closed Transition switch models)
-
- Option Package B:
-
- Waveform capture, ten (10) channels, up to 256 cycles each sixteen (16) samples / sec.
- Ten (10) customer programmable digital and ten (10)analog alarms.
- Includes Option Package A features, plus
- Auto Load Shed with voltage, frequency and kW triggers.
- Twenty (20) channel data logger, customer configurable sample period from one (1) cycle to sixty (60) minutes.
-
- Option Package C:
-
- Includes Option B features, plus
- Four (4) additional inputs and outputs (totaling eight (8) in & eight (8) out)
-
- Option Package D:
-
- Customized user control logic
- Includes Option Package C features, plus
- Four (4) additional inputs and outputs (totaling twelve (12) in & twelve (12) out)
-
- Option Package M:
-
- Configuration for Manual Operation only (Non-Automatic)